// A lot of visitors today, but I’m sure we are only warming up to more and more activity on site. Building inspectors paid us our first visit today. They will be back tomorrow to approve our site. Today the shear wall nailing was finished and the framing of interior walls is complete. I was incorrect with saying there were finished on Friday, there was very minor touches that needed to be done. The roofers came today as well and began adding crickets. Crickets build up the roof to guide the water to the drain. They also made cutouts for the drains. Vertex Mechanical, our plumbing donors, also came today. They did a rough layout of the plumbing.