// The 70 inch shower drain was installed today and our plumbing inspection was approved! Yipee! The first rail for roof racking was installed. Windows are going in! The clear story windows above the mech room are there. The TV and data cables are wired. Although everyone has been working their bottoms off, we are still a week behind but hopefully we will be able to catch up by the 6th because the installation guy is coming on Tuesday.