// Today the bathroom pocket door was framed. The endcap pocket walls were also worked on.
We are having bamboo panels on the some of the interior walls. Those were fabricated today. The corners were mitered to give the edge a 45 degree angle rather than a 90 degree angle.
Wood Anchor delivered the elm decking, which is the same material we are using on the interior floors. We won't be putting the deck up for a couple more weeks (the whole deck won't be going up until we are in DC).
We are slowly closing down our fundraising gap. There is certainly a lot that still needs to be done, but the last two weeks were productive in getting pledges. If you know of any companies of persons that would be interested in helping our project out please spread the word!
If you would like to see pictures of our progress click here to see them!