// Our cabinets arrived today! The ramps for the deck are being built. Skin is still moving along. It is very long process! But the south side is being completed. The backdoor was installed, it can't be used yet though so everyone has to walk around. This is when it is nice we have an small house compared to say, a house the size of the gym (because we can only enter on one side rather than two). The blocking on the deck is being worked on too.